top of page
GEC GREENENERGYCOIN
6.png

The beginning of the company "OFEK Technology Inc.", will be the start of the project - GEC GREENENERGYCOIN. 

GEC GREENENERGYCOIN is a project focused on the energy sector of the global economy in the field of "Green Energy" - the production of electricity from renewable energy sources.

The project is focused on the construction of network solar power plants (SPP) in the Balkans (Montenegro and  Croatia) to sell electricity to a centralized network without intermediate accumulation.

Electricity is sold to consumers through the connection of power plants to Montenegro and Croatia's energy networks.

In the process of implementing the project, it is planned to provide electricity generation on the basis of renewable sources.

Developed by OFEK Technology Inc., bifacial technology for solar panels opens up new possibilities for increasing energy efficiency. This innovative technology allows for a 50% increase in the amount of generated electricity!

 

Bifacial technology provides a unique approach to solar radiation collection. Unlike traditional one-sided solar panels, bifacial panels can capture solar energy from both sides. This means that they can efficiently utilize not only direct sunlight but also reflected light that falls on the backside of the panel.

With this technology, you will be able to significantly enhance the performance of your solar energy system. Bifacial panels ensure high energy efficiency even in conditions with a lack of direct sunlight, such as cloudy weather or being in the shade. As a result, you will obtain 50% more generated electricity, reducing dependence on traditional energy sources and decreasing environmental impact.

When implementing the GEC GREENENERGYCOIN project, only innovative technology will be used at its solar power plants - bifacial technology.

 

During the implementation of the project it is planned to build a network of solar power plants with a total power of 600 MW.

The total electricity capacity will be: 1,438,540,009.04 KW per year.

Project implementation period is: 5 years.

The payback period is: 3 years.

The operation of solar power plants is completely safe for the environment, and will help preserve the beauty of nature in the Balkan region. Solar power plants are real ways to protect against climate change without creating new threats to the modern World.

More detailed information about the project https://www.greenofekcoin.com/  

bottom of page